How many jackets do I have to order, and what if I need fewer?
Outerwear runs start from 50–100 pieces per style and colour, agreed case by case with the factory. Heavier builds sometimes ask for more.
A jacket has more parts than any other garment, and each one can carry its own minimum: the shell fabric, the lining, the fill and branded trims such as zips with your puller.
Want fewer? Tell us your quantity in the brief and we tell you honestly whether a factory in our group can take it.
Which certifications can outerwear get, and which ones do I need?
bluesign for technical fabrics and GRS for recycled content are the certificates you meet most in outerwear.
- bluesign covers chemical inputs and resource use at the mill that makes the fabric. The sewing factory is usually not the bluesign partner, so a bluesign claim rests on the fabric’s paperwork.
- GRS is what you need for a recycled shell, lining or fill claim, with a transaction certificate for your lot.
- Waterproof ratings are a test, not a certificate. If you print a rating, ask for the test report on the shell fabric.
Name the certificate in your brief and we only make your order in a factory whose scope covers it.
How long does an outerwear sample take, and how long does production take?
It is one of the longer categories: a sample round usually takes 2 to 3 weeks, and production 8 to 10 weeks after approval.
Components are what hold a sample up. A trim or fill that still has to be sourced delays the first piece, so fix every zip, snap, interlining and fill weight in the tech pack first. Ours takes 3–5 working days (€79, with 2–3 revision rounds).
For an autumn drop, brief us at least 12 weeks before your ship date.
What does an outerwear brief need before you can quote?
Missing trims are the most common reason outerwear quotes change. A firm quote needs:
- Fabrics: shell, lining and interlining, with weight and any coating or membrane
- Fill: type and weight, and the quilting or baffle layout
- Every trim: zips, snaps, cord stoppers, pullers and labels, with references
- Seams: taped, bound or plain, per seam
- Measurements: taken over layers, across your size range
- Quantities and date: pieces per style, colour and size, and your ship date
Outerwear quotes hinge on the bill of materials, which is what the tech pack (€79) is built around.
What goes wrong at the outerwear sampling stage, and how is it avoided?
Check fit over layers, pocket placement and how the fill sits before you approve.
- Too tight over layers: a jacket that fits over a T-shirt but not over a jumper. Measure and try it over the layers your customer will wear.
- Fill that shifts: down or wadding that clumps in a channel. Shake the sample, wear it and check the channels again.
- Pockets in the wrong place: hands don’t reach them, or they pull when the jacket is closed. Try them on a body.
- Substituted trims: a zip or snap swapped because the specified one wasn’t available. List every trim by reference in the tech pack.
- Leaking seams on shells: test taped seams with water before approval.
How do I shortlist an outerwear factory?
Outerwear needs heavier machines, fusing and fill handling, and a factory set up for wool coats is not automatically set up for down.
- Equipment: fusing, fill handling and seam taping where your build needs it
- Product fit: padded, down, shell or wool pieces like yours
- Trim sourcing: who sources zips, snaps and fill, and how close they are
- Certificates: bluesign and GRS paperwork for technical and recycled fabrics
- Minimum and dates: whether your quantity per style and colour fits
When you brief us, our team does this shortlisting, sends the order to a factory in our group equipped for your build and manages it to delivery.